Fixture, bushings and bolts needed to locate and drill new hole in vertical fin tail skid p/n 206-020-110-103 at the attachment hole location.
Lead time is about 4-5 weeks as the bushings and bolts must be ordered from an outside supplier.
And they are expensive.
- ATA Chapter:
- 53-Fuselage
- ATA Chapter:
- 55-Stabilizers
- Maintenance Type:
- Flightline
- Maintenance Type:
- Overhaul